Discussion on Trial Grouting Results, and Design of Soil Improvement Measures Against Liquefaction for Existing Bridge’s Shallow Foundation Site of Freeway
作者
林生發、游步上、鄭俊傑、李奕霆、郭國振、彭康瑜、張哲胤
關鍵字
震陷量、地中壁、剪力波速、超微細水泥
摘要
Existing pier foundation type is shallow foundation. Because this soil straturm has a high liquefaction potential, it is estimated that there is a risk of liquefaction and earthquake subsidence due to the seismic code. At the preliminary design stage, excessive reinforcement costs is uneconomical. Collected domestic and foreign ground improvement engineering cases and theoretical studies against liquefaction. Ground improvement of shallow foundation, only for those with Liquefaction Potential Index > 5 and the seismic subsidence is greater than the allowable value. It is saving about NT$2.3 billion. The underground wall is the first application for against liquefaction in Taiwan Freeway site M38B. It can limit the displacement derived from soil liquefaction. Some areas, such as abutments or the foundation is located at the ramp where it is difficult to construct the ground wall. Carry out the Double Packer grouting method of oblique grouting to improve the resistance to liquefaction . In addition, considering that the low-pressure grouting material has permanent properties and good permeability of micro-fine cement, the large-scale use of micro-fine cement is also the first application in Taiwan. In order to ensure the effectiveness of the construction work, the trial grouting operation was carried out before the construction. It is carried out to confirm the forming effect by the excavation of the ground improvement. This case is the largest scale of foundation against liquefaction in underground wall and micro-fine cement low-pressure grouting.
英文摘要
Existing pier foundation type is shallow foundation. Because this soil straturm has a high liquefaction potential, it is estimated that there is a risk of liquefaction and earthquake subsidence due to the seismic code. At the preliminary design stage, excessive reinforcement costs is uneconomical. Collected domestic and foreign ground improvement engineering cases and theoretical studies against liquefaction. Ground improvement of shallow foundation, only for those with Liquefaction Potential Index > 5 and the seismic subsidence is greater than the allowable value. It is saving about NT$2.3 billion. The underground wall is the first application for against liquefaction in Taiwan Freeway site M38B. It can limit the displacement derived from soil liquefaction. Some areas, such as abutments or the foundation is located at the ramp where it is difficult to construct the ground wall. Carry out the Double Packer grouting method of oblique grouting to improve the resistance to liquefaction . In addition, considering that the low-pressure grouting material has permanent properties and good permeability of micro-fine cement, the large-scale use of micro-fine cement is also the first application in Taiwan. In order to ensure the effectiveness of the construction work, the trial grouting operation was carried out before the construction. It is carried out to confirm the forming effect by the excavation of the ground improvement. This case is the largest scale of foundation against liquefaction in underground wall and micro-fine cement low-pressure grouting.